Watch: 20-tonne reservoir wall installed in three-day project

Neutral 0.0
The steel structure was lowered into place at the new reservoir in a 72-hour continuous operation.
Read Source Login to use Pulse AI

Pulse AI Analysis

Pulse analysis not available yet. Click "Get Pulse" above.

This analysis was generated using Pulse AI, Glideslope's proprietary AI engine designed to interpret market sentiment and economic signals. Results are for informational purposes only and do not constitute financial advice.