Why fit-out contractors can’t afford to wait for certainty about the 2031 deadline
Carl Saxon is a regional director at engineering consultancy Wallace Whittle When looking at the world of fit-outs, there has always been a tendency to treat energy performance as someone else’s problem. With the architects specifying it, building owners carrying the regulatory risk and the… The post Why fit-out contractors can’t afford to wait for certainty about the 2031 deadline appeared first on Construction New…
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
