Arizona DOT taps Sundt for $396M highway job
The Tempe-based builder will negotiate with the state’s DOT on a preconstruction services contract that is expected to be finalized in February.
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
