How Highway 101’s Final US$114 Million Segment Win At Granite Construction (GVA) Has Changed Its Investment Story
Caltrans announced that Granite was awarded the Segment 4E North contract of the Highway 101 Carpinteria-to-Santa Barbara CM/GC program, a US$114 million project that will rebuild lanes, add peak-period carpool lanes, and reconstruct the Cabrillo Boulevard interchange to improve safety and traffic flow. This seventh and final mainline segment award further extends Granite’s role as construction manager for the ful…
AI brief
Pulse reads the full article- What happened
- Why it matters
- What to watch
Sign in to get the AI brief. Pulse explains what happened, why it matters, what to watch and who's exposed. Free for members.
Sign in to read the brief
